Ambitek UAE

Data Centre - Construction Manager

Riyadh, Saudi ArabiaPosted 5 days ago

Salary
AED 12k–18k a month· est.
Job type
Full time
Level
Lead
Field
Construction & Engineering
Work mode
On site

About the role

Data Centre Construction Manager Remote site within reach of Riyadh, Saudi Arabia Ref AMB/PR/2611/005 You are the person on site who knows exactly where the power train is against programme, which chiller is late, and whether the contractor will really be ready for integrated systems testing. Right now you are probably running one package of a data centre, or running the whole site for a contractor whose commercial targets shape every decision you make. You spend your days closing NCRs, chasing submittals and walking the white space before the IT equipment arrives. What wears you down is rarely the engineering. It is being measured on the contractor’s margin rather than on whether the facility works first time, and watching commissioning get squeezed because the programme slipped months earlier. Stay where you are and the next three years will probably look like the last three: another package, another handover rush, the same view from the same side of the table. This role puts you on the supervision side of a large, mission-critical data centre build in central Saudi Arabia, working for an international engineering consultancy. You lead the site across civil, structural, architectural, MEP, ICT and ELV works, from mobilisation through Level 1 to Level 5 commissioning and handover to operations. You review method statements, submittals and shop drawings, track long-lead equipment, give constructability and value engineering input, and mentor the site engineers and supervisors around you. You need an engineering degree in mechanical, electrical or civil, 15 years or more in construction management, data centre or mission-critical delivery, and hands-on testing and commissioning. Remote sites will not surprise you. Saudi Council of Engineers accreditation is needed before mobilisation; if you do not hold it yet, we will talk you through it. If that is roughly where you are, send your CV to [email protected] quoting AMB/PR/2611/005

Requirements

An engineering degree in mechanical, electrical or civil; 15 years or more in construction management, data centre or mission-critical delivery, and hands-on testing and commissioning. Saudi Council of Engineers accreditation is needed before mobilisation; if you do not hold it yet, we will talk you through it.

Responsibilities

Lead the site across civil, structural, architectural, MEP, ICT and ELV works from mobilisation through Level 1 to Level 5 commissioning and handover to operations. Review method statements, submittals and shop drawings, track long-lead equipment, provide constructability and value engineering input, and mentor the site engineers and supervisors. Manage one package or the whole site for a contractor, close NCRs, chase submittals, and oversee commissioning to ensure the facility works first time.

Skills

  • Data centre delivery
  • Construction management
  • Site supervision
  • Commissioning (Level 1 to Level 5)
  • MEP coordination
  • Submittals and shop drawings review
  • Value engineering
  • NCR closure
  • Testing and commissioning
  • Project oversight
  • Civil, structural, architectural coordination
  • ELV integration
  • Long-lead equipment tracking
  • Method statements review

Not sure you fit this role?

Upload your CV and see how you score against Ambitek UAE and every other live job. It's free.

Get my free matches

Similar jobs in Saudi Arabia